Publication

Commissioning of the Diamond Pre-Injector Linac

Authors: C. Christou (Diamond Light Source) , V. Kempson (Diamond Light Source) , K. Dunkel (Accel Instruments GmbH)
Co-authored by industrial partner: No

Type: Conference Paper
Conference: Tenth European Particle Accelerator Conference (EPAC '06)
Peer Reviewed: No

State: Published (Approved)
Published: June 2006

Abstract: Commissioning of the linac for the Diamond Light Source (DLS) was completed in October 2005. The linac was supplied by Accel Instruments, with DLS providing beam diagnostics, beam analysis software, control system hardware and standard vacuum components. Much of the beam analysis was carried out using the first part of the Linac to Booster transfer line (LTB) which was designed and built by DLS. Operation of the linac and LTB at 100 MeV in long-pulse and short-pulse modes of operation was demonstrated, and all operational parameters were measured to be within specification.

Subject Areas: Engineering


Technical Areas: Accelerator Physics